Projects — Mine Turnaround, Feasibility & EPC Case Studies
Westech International
📍 United States
via Verified Homepage
Full-TimeOn-Site💰 18+
Description
Six flagship mining projects with numbers and named counterparties: Mineral Hill US$55M turnaround, Vatukoula 1Mtpa restart at 1,200m depth, Woulfe tungsten redevelopment, Black Dragon US$1B NPV recast, Otso 18-month build, Browns Oxide 1.2Mt SX/EW.
Similar Jobs
Water Treatment Technician, Solar Cells (Starlink)
NewSpaceX
📍 Bastrop💼 Full-Time🏠 On-Site
PECVD Process Engineer, Solar Cells (Starlink)
NewSpaceX
📍 Bastrop💼 Full-Time🏠 On-Site
G
Expanding the Energy Geochemistry Database - Geological Survey
Geological Survey
📍 Denver, Colorado, Colorado💼 Full-Time🏠 On-Site
Engineering Technician (Seasonal) - National Park Service
National Park Service
📍 El Portal, California, California💼 Full-Time🏠 On-Site💰 17.53 – 25.5